Operating instructions
20
GT 300 A/II 31/08/06 - /ND
27 Hydraulic test
For USA: After assembling the boiler body, the installer must carry out a water tightness test at a pressure equal to 1.5 times the operating
pressure (that is 108 PSI minimum) for 10 minutes at least.
The test must be done at room temperature.
For Canada: After assembling the boiler body, the installer must carry out a water tightness test at a pressure equal to 1.5 times the operating
pressure (that is 81* PSI minimum) for 30 minutes at least.
The test must be done at room temperature.
*: 59 PSI minimum in Alberta.
Ensure that all the air in the boiler is vented to avoid any bursting of the body.
8553N133
2
3
1
1










