Operating instructions
4
GT 300 A/II 31/08/06 - /ND
Assembly GT 330
Tools required
• Tube of silicon caurk
• Side cutter (for cutting thermocord)
• Wire brush (for cleaning section openings): use of a *1" fitting brush attached to cordless saves time.
• Sand cloth (for cleaning nipples): Using a power brush saves time.
• Solvent
• Wooden or rubber mallet
• Tightness sealant: See step 28
THESE TOOLS ARE IN ADDITION TO YOUR NORMAL TOOL REQUIREMENTS.
some spare screws are provided.
Warning : the order of assembly is given by the numbers of the various figures.
Symbols used
Caution danger
Risk of injury and damage to equipment. Attention must be paid to the warnings on
safety of persons and equipment
Specific information Information must be kept in mind to maintain comfort
Z
Reference Refer to another manual or other pages in this instruction manual










