Operating instructions

2
GT 300 A/II 31/08/06 - /ND
Installation codes
The boiler shall be assembled and installed by a qualified professional only. Strict compliance with these installation and operating instructions
is a precondition for the correct and guarantee of the boiler.
The installation must conform to the requirements of the authority having juristriction or, in the absence of such requirements, to the CAN/CGA
B-149 fuel gas installation codes and CSA B-139 oil installation codes.
Where required by the authority having juristriction, the installation must conform to the standard for controls and safety devices for
automatically fired boilers ANSI/ASME CSD-1.
The installation of the relief valve shall be consistent with ANSI/ASME boiler pressure vessel code, section 1V CSA B51.
The boiler must not be installed on carpeting.
If an external electrical source is utilized, the boiler when installed, must be electrically bonded to ground in accordance with the requirements
of the authority having juristriction or, in the absence of such requirements, with the canadian electrical code part 1.CSA C22.1 electrical code.
Label all wires prior to disconnection when servicing controls. Wiring can cause improper operation after servicings. Verify
proper operation after service.