Specifications

Technology Upgrade Classroom Video 28 5300-6
1224_01
2. Connect with patch cables at the projector/interactive white board to the CAT-6 jack in
the faceplate.
3. Connect output of PC to the other USB to UTP unit. Install patch cable to the
faceplate near the PC.
E. Switcher shall be mounted in the rack or on the desk and shall be at a height at which a user
can comfortably interface.
1. The Contractor shall make sure that all cables attaching to the switcher are labeled
with the item from which they route. The Contractor shall provide and install a
permanent label for each of the buttons on the front of the switcher to show which
input is connected to which button.
2. The switcher shall be fully connected and interfaced with each input and output
device. All connections shall be made, and tested prior to turnover to the Owner.
3. The switcher shall be fully integrated with the wireless control system. All functions
shall be available through the control system.
4. All settings on the switcher shall be set to provide the highest quality video and audio
output.
5. The Contractor shall test each input and each output for proper configuration. The
testing shall be done while controlling the switcher locally as well as through the
wireless control system. All aspects of the systems shall be tested prior to turnover to
the Owner.
F. HDMI to UTP
1. Setup the device to pass all HDMI Signals
2. Install all patch cables required for connectivity.
3.05 INSTALLATION OF PROJECTION SCREENS
A. Projection screen
1. Coordinate provision of manual screens with locations of other wall and ceiling
mounted components such as visual display boards, Acoustical Ceiling, Structural
framing, light fixtures, air diffusers, ducts, and fire sprinklers to eliminate potential
conflicts.
2. Coordinate installation of mounted screens with construction of suspended acoustical
panel ceilings.
3. Install screens in accordance with approved shop drawings and manufacturer's
installation instructions.
4. Install projection screens at locations and heights indicated on Drawings. Verify
locations in field with Architect.
5. Operate each screen three times minimum. Ensure screens properly extend and
retract and that screen is level and viewing surface plumb when extended. Adjust to
correct deficiencies.
6. Mount all screens from the wall. Do not cover the Fire Alarm devices with the screen.
END OF SECTION