Technology Upgrade Submittals 28 7200-2
1224_01
2.03 PRODUCT SAMPLES
A. Product Samples shall consist of a sample of the actual product that is to be installed.
B. Samples shall be tagged with the part number and specification section to which it pertains.
C. Product Samples shall be provided for the following:
1. None at this time.
PART 3 - EXECUTION
3.01 DOCUMENTS
A. The Contractor shall provide all submittals to the Construction Manager or the Engineer prior
to beginning installation.
B. The Contractor shall provide PDF and Excel Files for all Product Data Sheets.
1. All Product Data sheets shall be PDF files and shall be combined into a single file
2. The data sheets in the File shall be segmented to match the specification section and
page number they pertain.
3. The Contractor shall highlight the actual part number on the sheet of the component
that they are submitting.
4. If no part number is highlighted or marked with an arrow, then the entire submittal
package will be rejected and sent back for re-submission.
5. Contractor shall submit an electronic copy of the Excel spreadsheet with their data
sheets that details the manufacturer, part number and common name of the products
that they are submitting.
C. The Contractor shall provide 2 sets of Shop Drawings.
1. Shop drawings shall be marked for the specification section of the bid documents to
which they pertain.
2. All shop drawings that are required to be drawn on the building background shall be
provided on full-size drawings the same scale as those in the bid documents.
3. All lines on the shop drawings shall be highlighted or completed in ink that is not the
same color as that provided in the bid documents.
4. The contractor shall provide a drawing legend detailing all symbols used in creation
of the shop drawings.
D. The Contractor shall provide one of each product sample required to be submitted.
1. Provide a cutsheet with each product sample detailing the specifics of the product
and what it is proposed to be used for.
3.02 SUBMITTAL REQUIREMENTS
A. Submittals shall be provided for approval prior to installation of the work.
B. Any equipment installed that does not have an approved submittal associated with it can and
will be removed from the project and replaced with other equipment as defined by the
Engineer. All replacement costs shall be the responsibility of the Contractor.
C. It shall be the responsibility of the Contractor to provide the submittals for review in sufficient
time so as to not delay the installation. Work with the Construction manager on the
schedule.
END OF SECTION