SECTION 28 7200 – SUBMITTALS
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. This section provides the Contractor with requirements in regard to Product Data, Shop
Drawings and Product Samples collectively referred to as “Submittals”.
B. The requirements of this section deal only with those submittals that are required to be
provided by the chosen contractor prior to beginning the work. No submittals in this section
are required to be provided with the Bid Response.
C. The requirements contained herein should be considered bound and apply to all
specification sections per this contract.
1.02 SUBMITTALS
A. The contractor shall provide material submittals to the Construction Manager or directly to
the engineer, whichever is managing the project.
B. Prior to beginning work, the chosen Contractor shall provide 4 sets of material submittals. All
paper submittals shall be bound in a 3-ring binder. The binder shall be clearly marked with
the project name and number, and additionally marked as “submittals.”
C. Send an Excel spreadsheet in .xls format to the designer for their use in reviewing the
submittals.
D. PDF documents for submittals are allowed.
1. Provide an Excel Spreadsheet listing the following:
Description
Manufacturer
Part Number
Enet Switch
Rainbos
XR-243T
PART 2 - PRODUCTS
2.01 PRODUCT DATA SHEETS
A. Product data sheets shall consist of the manufacturers detailed specification sheets or “cut-
sheets” for each product that is to be installed by the contractor or any subcontractors.
B. Product data sheets shall minimally include, but shall not be limited to:
1. Part Number
2. Manufacturer
3. Description of the product
4. Physical dimensions and characteristics of the product
5. Picture or manufacturers drawing of the item, where applicable
6. Electrical characteristics of the product including heat-load for active electronics.
7. Optical characteristics of the product for Fiber-Optic equipment and cable.
C. Provide product data sheets for all equipment and cabling that is to be installed by the
contractor
2.02 SHOP DRAWINGS
A. Shop Drawings shall consist of detailed drawings showing actual connectivity and cable
types for the systems noted below:
1. Wireless Access Points. Location and type
2. Data Network
3. AV Classroom Systems
4. Telephone System
B. Shop drawings shall also be provided for systems that the contractor intends to connect