Specifications

Technology Upgrade Wireless 28 6250-6
1224_01
B. Access Points shall be installed to the ceiling or wall as is appropriate for each individual
location.
1. For drop ceilings the WAP shall be installed below the drop ceiling and shall be
attached to the drop ceiling T-bar. Provide all mounts required.
2. For Drywall ceilings the WAP shall be secured to the drywall and optimally the
framing behind the drywall. Provide a mount for drywall ceiling mounting
3. For open ceilings the contractor shall attach the WAP to the building structure.
4. Where a wall mounting is requited the WAP shall be located high on the ceiling and
away from access.
5. In gymnasiums the contractor shall provide a mesh covering for each WAP.
6. Provide the correct mount for each installation location.
C. Each WAP shall be labeled with a machine printed label. See below for requirements.
3.05 POST INSTALLATION
A. Load all software and firmware upgrades on the controllers and WAP’s
B. Conduct a physical site survey to determine the actual signal level in each building.
1. The site survey shall include a technician being onsite and taking real world signal
level measurements.
2. Create a heat-map that details the signal level throughout each building.
3. Provide the heat-map to the owner and provide any suggested additions of WAP’s to
better serve the owner’s needs.
C. See closeout and cutover requirements in the Testing specifications
3.06 LABELING
A. All supplied devices shall have a label affixed in a visible location on the front and rear of the
equipment. This shall include all Access Points.
1. The label shall identify the switch name and IP address.
A. All labels shall be machine printed.
END OF SECTION