Service manual
INSTALLATION Cont 
1.  Make all connections: C02 gas, plain water . 
2.  Place CR-UC2 in position. Make sure sufficient space between bulkheads, walls and 
overheads is available for proper air circulation around cooling unit. 
INSTALL HIGH PRESSURE C02 REGULATOR, C02 CYLINDER AND LINES 
1. Install high pressure C02 regulator (CR-3741), on C02 cylinder using a new seal 
gasket. 
MAKE SURE NEW WASHER IS INSIDE REGULATOR ASSEMBLIES COUPLING NUT 
BEFORE CONNECTING TO CYLINDER. 
  WARNING-: To avoid personal injury and/or property damage, always secure C02 
cylinder with safety chain to prevent cylinder from falling.  It is recommended that 
the C02 cylinder be installed away from heavily traveled areas such as doors, 
passageways, corridors, etc. 
2.  Connect 1/4" inner braided plastic tubing from outlet of high pressure C02 regulator, 
(S-101), on C02 cylinder to Tee connection at low pressure regulator, (S-221), using 
prefabricated gas charging line, (S-105). 
3.  A line must be fabricated at this time. Cut inner braid tubing to size and install 
nipple, (S-145), and nut, (S-150), to each end of tubing making sure either oetiker or 
ferrule is previously installed on line. Secure these connections by use of proper 
tool. Connect ¼“, inner braid plastic tubing from outlet of tee at low-pressure 
regulator, (S-221), (optional furnished with unit), to supplied line from unit marked 
gas. 
HIGH PRESSURE C02 REGULATOR   SECONDARY PRESSUR C02 
REGULATOR (CR-3741)     REGULATOR (CR-T5261SN) 
24 
160
150
14030
3000
2000
15001000










