Service manual
LOCATION RECOMMENDATIONS FOR CR-UC2 
1.  Position unit as close as possible to proper electrical source, 120V 60HZ. 
2.  Position unit with a minimum of 6” space between bulkhead and cabinet for sufficient 
ventilation (air in and air out). Pour ventilation can cause the unit to overheat and shut 
down or have pour performance characteristics. Allow enough space between ceiling and 
unit for lid removal. 
3.  Position unit as close as possible to water source. Half-inch gate valve recommended for 
water connection. 
4.  Enough space must be allowed to install C02 cylinder and, water filter. 
5.  Position unit as close as possible to floor drain for over flow tube. Unit will primarily only 
drain water from over flow tube upon initial start-up and freezing of ice bank. 
SAMPLE OF POSSIBLE INSTALLATION.(single Tower) 