Service manual

CHAPTER II
INSTALLATION
This chapter covers unpacking and inspection, selecting location, installing CR-UC# and
related components, connecting water inlet and electrical requirements.
UNPACKING AND INSPECTION
Upon receiving unit, immediately remove unit from shipping carton and inspect for
shipping damage.
NOTE: Before leaving the factory all CR-UC# units were carefully inspected and the
carrier has accepted and signed for them. Any damage or irregularities should be noted
at the time of delivery and immediately reported to delivering carrier. Request a written
inspection report from claims inspector to substantiate any necessary claim. File claim
with delivering agency, not International Carbonic Inc.!
Unpack LOOSE-SHIPPED PARTS. At this time make sure all parts listed are present
and in good condition. If any parts are missing, notify factory.
TABLE 2-1
LOOSE - SHIPPED PARTS
Item
No. Name Qty
1 Installation/Service Manual 1
2* High Pressure C02 Regulator 1
3 6’ Gas Line (Inner Braid) 1
4* Water Pressure Regulator 1
5 Water filter Manifold 1
6 Water Filter Cartridges 2
7* Back Flow Preventer 1
8 Barb Fittings & Oetiker Clamps Lot
9 CBR-V2 Draft Tower (w/ CR-UC2 only) 1
9b CBR-V1 Draft Tower (option) 2
10 Drip Tray (w/ CR-UC2 only) 1
* Optional
SELECTING LOCATION
IMPORTANT: Ambient temperature for CR-2 and CR-UC2 should not exceed 100
degrees “F.” Operation of cooling unit in ambient above 100 degrees “F” can and will
contribute to early failure of condensing unit and poor quality of finished product.
17