Installation guide
2
Crysalli/Western Pacific – 1739 Sabre Street Hayward, CA 800-229-4410 www.crysalli.com
10.Turn on the Water. Check all connections for leaks.
11.Open CO2 by turning knob on tank. Adjust regulator between 55-75 PSI,
check for leaks.
12. Run the clear overflow drain hose to floor drain or other waste drain for
initial over flow and condensation on start-up from ice bank formation.
13. Fill Water Bath: Remove lid and fill water bath with non-filtered tap water, to
¼” from top of standpipe. This is the white over flow tube in the water bath.
14. Plug unit power cord into 120-volt outlet. Toggle the ON/OFF rocker switch
to the ON position. Fan and compressor will turn on. Fan and Compressor will
automatically turn off when a complete ice bank is made and cycle on and off
to maintain it.
15. Check for leaks, make sure faucet shanks are tight and wrap any exposed
trunk line tubing with insulated tape.
16. Unit will take between 3 & 4 hours to make a complete ice bank.
17. Pull open the still water and sparkling water faucets to run water through
the system. You will need to run the sparkling water faucet for several
minutes to cycle the carbonation system before full sparkling water will
dispense.
18. Once unit has built the ice bank you are ready to dispense chilled still and
chilled sparkling water.
CR-KIT-UC Install Kit is available which includes barb fitting, clamps, extra hose,
armaflex, back flow preventer and water regulator.
CBR2-FS Fitting Kit is available when a second tower is being installed.
Owner’s manual and Registration can be found online at www.crysalli.com