Instructions / Assembly
Step 1
Decide where and how high you would like to start your CrownWall.
Measure the starting point from the floor up and mark the spot with
a pencil.
Step 3
Step 2
Using the stud finder, locate and mark all studs in between the
starting stud and finishing stud. Panels must start and finish on
studs. Studs should be centered 16” (41cm) apart in order to support
100lbs (45kg) per square foot. Use a level to mark along their length as
you will need to screw each panel into each stud.
Installing the first panel: use a level to
ensure that your starting panel is
straight. Start by screwing through the
starter line. The starter line is located in
the center of the upper channel of the
panel. Do this for each stud (16" apart or
41cm) except the start and ending studs.
Starter Line
CrownWall
4’ x 8’ Panel Kit




