9.4 Chemical Storage Tanks (Optional; must be called for in the Technical Specification)
Scope: Pump system manufacturer shall provide the following as part of the pumping system. These
items shall be shipped loose and installed on site. If there are any discrepancies between this section and
the main specifications, this section takes precedence.
Installation /Start-up: It is the responsibility of the customer to provide any necessary pad or
containment for tanks prior to installer arrival. It is the responsibility of the pump station manufacturer to
provide the chemical storage supply tanks and connect from tanks to suction connection of each injection
pump. Installation to include complete assembly and water testing of system & operator training.
The quantity and size of the chemical storage tanks to be provided by the pump station manufacturer will
be called out either on the drawing or in the technical specifications.
500 gallon HDPE cone bottom tank with leg stand, 2" outlet with 2" suction isolation valve, 2" return
line fitting, and 30' of 2" suction hose.
1050 gallon HDPE cone bottom tank with leg stand, 2" outlet with 2" suction isolation valve, 2" return
line fitting, and 30' of 2" suction hose.
1600 gallon HDPE cone bottom tank with leg stand, 2" outlet with 2" suction isolation valve, 2" return
line fitting, and 30' of 2" suction hose.
12.8 Stainless steel wet well inlet screen (Optional; must be called for in the Technical
Specification)
An all stainless steel box screen will be provided if called for in The Technical Specification. The screen
will be box style with stainless steel mesh on three sides. The top, bottom and outlet sides will be solid
stainless sheet. For support of the screen, stainless steel legs will be attached to the bottom. The
Technical Specification will describe the overall minimum dimension of the screen and will specifically
identify the inlet pipe style, and exact outside diameter. The box screen will have a clamp on style fitting
with stainless steel bolts and nuts to slide over the inlet pipe.
SECTION 13: WARRANTY
The manufacturer shall warrant the pumping station to be free of defects and product malfunctions for a
period of one year from date of start up or fifteen months after shipment, whichever occurs first. Failures
caused by, lighting strikes, power surges, vandalism, flooding, operator abuse, or acts of God are
excluded from warranty coverage. All warranties implied or otherwise shall not exceed those warranties
extended by major or sub-component suppliers.
SECTION 14: SITE PREPARATION DRAWINGS
Drawings shall be furnished by the manufacturer within two weeks after receipt of order. Drawings shall
indicate pump station alignment, discharge piping size, and electrical services required from local
contractor. The owner shall return one set of drawings marked approved or corrected within one week of
receipt.
SECTION 15: OPERATION AND MAINTENANCE MANUALS
An operation and maintenance manual shall be furnished at time of start up.
END OF SPECIFICATION: SSTV Written Spec-08-22-06