Instructions / Assembly

11
(Fig. 3)
(Fig. 4)
2.1. 3.
Consultyourhydrauliccement
manufacturer’sspecificationsfor
coreholediameteranddepth
basedonthefinalrailingheightfor
yourinstallation.Afterdepthand
diameterhavebeenconfirmed,drill
andremovethecorefromthehole
(Fig.1,2).
Placethepostintheholeandadjust
forplumb(Fig.3).Temporarily
secureinplaceusingclampsand
woodsupports(Fig.4).
Mixandpourhydrauliccementas
permanufacturer’sinstructions(Fig.
5).
Afterposthascured,followthe
instructionsforRDIflush-mount
structuralpost,beginningwithStep
4.
(Fig. 2)
(Fig. 1)
(Fig. 5)