Instructions / Assembly
Installation
2:2
Dryer Enclosure Requirements
Commercial
• Bulkheads and partitions are recommended to be made of noncombustible material.
• The requirement to allow the door to open completely is 36 inches (91 cm).
• A minimum overhead clearance of 6-inches (15.24 cm) is recommended.
• Dryer should be positioned a minimum of 12-inches (30.5 cm) away from the nearest
obstruction. 24-inches (61 cm) is recommended for ease of installation, maintenance, and
service.
• Flooring should be level and below dryer cabinet for ease of removing panels during
maintenance.
• Dryers may be positioned side by side.
IMPORTANT
The Dryer – Dryer stacked unit is recommended to be installed by 2 people.
For stacked washer and dryer unit, the washer should be installed in accordance with washer
installation manual and tested rst.
Minimum clearances for closet and alcove installations: Sides 1", Rear 3", Top 1",
Front 3". Closet doors must be louvered or otherwise ventilated and have at least
60 square inches of open area.
WARNING