Technical data
18” Inset Taper 010710 
2.5 LAYING THE BED               18 “ Inset 
Fig. 19 
Fig. 20 
Page 11 
Metal `stops’ 
The simulated front is positioned on the shelf directly 
in front of the support shelf. Two metal `stops’ locate the 
simulated front in position. 
Fit the two front retaining brackets with the two No 8x3/8 screws 
supplied in the fixing pack to secure the front into position (Fig. 4). 
The support shelf is positioned on the fibre support 
metalwork. There are two metal `stops’ that prevent 
the support shelf from sitting on the main burner outlet 
(Fig. 3). 
Metal `stops’ 
Fig. 18 
Note: Large coals/pebbles (grey) and small coals/pebbles 
(black) are coloured for illustration purposes only! 
Side View 
Place 6 large coals/pebbles on top of the simulated front (one in 
each groove). Allow the coals/pebbles to rest on the support 
shelf. Place 5 large coals/pebbles on the on the first tier of the  
support shelf (Fig. 5). 
Place 6 small coals/pebbles 
between the 6 large coals/pebbles 
located on top of the simulated front. 
Allow the coals/pebbles to rest on 
the 5 large coals/pebbles on the first 
tier. 
Place 4 small coals/pebbles on top 
of the 5 large coals/pebbles and 
allow them to rest on the back tier of 
the support shelf (Fig. 6). 
Fi
g
. 17 
To obtain the best visual appearance, it may be necessary to `slightly’ adjust the position of the coals. 
If any of the coals or coal bed become damaged or lost, replacements MUST be obtained before further use. 
ADDITIONAL COALS/PEBBLES MUST NOT BE USED
Front Retaining Bracket 










