Technical Manual

Technical Manual
ARGUS AM Floor System
Configuration v1.2 Page 33 of 65
12 Configuration
This chapter describes the recommended adjustment procedure for the ARGUS AM Floor
System.
12.1 General considerations
Refer to chapter 3.1 (page 6) for noise sources and installation guidelines.
Install the antenna(s) and Control Unit at the required location.
Connect the antennas to the corresponding connectors on the Control Unit.
Connect the power supply to the power input of the Control Unit
Switch on the power supply the power LED on the Control Unit board will light
up
Wait for about 10 seconds for the system to start up.
12.2 Configuration settings
Although the ARGUS AM Floor System comes pre-configured with factory settings, it is
necessary to fine-tune this board for best performance in the specific environment it is
installed in.
The ARGUS AM Floor System must be configured through the Field Bus using a laptop
and Cross Point Device Explorer software.