Specifications

3
quickstart guide
GL-IPAC-SW8
www.crestron.com
888.273.7876 201.767.3400
Specifications subject to
change without notice.
GL-IPAC-SW8
Crestron Green Light
®
Integrated Switching System
Wiring Diagram (Continued)
Occupancy Sensor Wired to SENSORS 1-4 Port
Occupancy sensors can only be wired to the SENSORS 1-4 port.
SENSORS 5-8
24 1 2 3 4 G 24 1 2 3 4 G
SENSORS 1-4
Additional Contact Closure Occupancy Sensor
Wired in Parrallel
(e.g., GLS-ODT-C-NS or GLS-ODT-C-2000)
Contact Closure Occupancy
Sensor
(e.g., GLS-ODT-C-NS or
GLS-ODT-C-2000)
NOTE: A maximum of 10 Cresnet occupancy sensors may be
connected.
Cresnet Occupancy Sensor and Photocell Wired Using Cresnet
24 Y Z G
CRESNET
Crestron Occupancy
Sensor
(GLS-ODT-C-CN or
GLS-OIR-C-CN)
24 Y Z G EXT
Photocell
(GLS-LOL)
Cresnet Cable
For Regulatory Compliance information, refer to Doc. 7401.
QUICKSTART DOC. 7389B (2036222, Sheet 2 of 7) 01.14
Use the dials to set the ID of the GLS-SIM to C0 - C9 to match the
ID defined in the program.
NOTE: A maximum of 10 GLS-SIMs may be connected.
Occupancy Sensor Wired to Cresnet Port Using a GLS-SIM
24 1 2 G
SENSOR
GLS-SIM
Crestron Occupancy Sensor
(GLS-ODT-C-NS,
GLS-ODT-C-2000)
Cresnet Cable
INPUT
CHANNEL
DIP
SWITCH
SETTING
1
1 On
2 On
2
3 -
4 -
24 Y Z G
CRESNET
24 Y Z G
CRESNET
(Continued on following page)