Installation guide

CRESTRON GREEN LIGHT
®
EXPRESS Power Switching Cabinet GLPS-HDSW-FT
Wiring
NOTE: All wiring must be installed in accordance with all local and national electrical codes.
NOTE: Refer to the torque settings specified on pages 8 and 9.
CRESTRON GREEN LIGHT EXPRESS power switching cabinets come pre-configured with GLXX-HDSW
switching modules already installed. The cabinets only require installation and wiring of feed and load circuits.
The following must be performed after mounting the cabinet:
Connect incoming feed conductors to the input terminals and connect loads to contact terminals (section A
of the following diagram)`
Connect control wiring (section B of the following diagram)
Feed-Through and Load Wiring
SERVICE
SCREWDRIVER
A
B
CLASS 2
WIRING ONLY
FEEDS
FROM
BREAKER
PANEL
TO
LOADS
FEEDS
FROM
BREAKER
PANEL
TO
LOADS
Installation Guide – DOC. 6887A GREEN LIGHT
®
EXPRESS Power Switching Cabinet GLPS-HDSW-FT 7