System information
Crestron 3-Series Control Systems Reference Guide
Reference Guide – DOC. 7150A 3-Series Control Systems • 63
Uploading Touch Screen Projects
Using the network connection to the control system, compiled VisionTools Pro-e
(VT Pro-e) projects can be relayed through the control system to any Cresnet touch
screen on the network. VT Pro-e projects can also be directly uploaded via a touch
screen’s serial port or Ethernet port (if equipped).
The compiled VT Pro-e project file can be uploaded to a touch screen using
VT Pro-e or Crestron Toolbox. If loading a project to a touch screen that has an
internal compact flash slot, use Crestron Toolbox.
Upload via VT Pro-e
1. Start VT Pro-e.
2. Select File | Open | Project to view the “Open” window, navigate to the
VT Pro-e file (.vtp), and click Open.
3. Select File | Upload Project. This automatically selects the compiled .vtz
file.
“Project” Dialog Box
• Selecting Send All Files sends the entire project.
• Selecting Send Selected File Types sends only the file types that
are selected. Core Files are files that include touch screen logic,
join number remapping, and other files related to touch screen
functionality. Graphic Files are graphics that are displayed on the
touch screen display. Sound Files are WAV files that are assigned