Installation Instructions
5
The following instructions are for struc-
tures with weather resistant barrier
(WRB) applied before doors are installed.
1. Cut weather resistant barrier (WRB) as shown in
(FIGURES 1 & 2). Cut sill and head even with and
parallel to framing. Cut diagonals in head WRB
(FIGURE 2).
2. Lift head WRB up and tape to face of exterior
(FIGURE 2). Fold side jamb WRB into the rough
opening (FIGURE 3).
3. Secure WRB to interior framing with staples
placed every 12" to 16" apart (FIGURE 4). If
desired, trim excess before stapling.
RO Preparation (cont.) Non-DPR Installation – All Units
Page 5 must be followed if you are installing
units that do not need to maintain design
pressure rating certification.
ROUGH OPENING PERIMETER
(DO NOT CUT!)
WEATHER RESISTANT BARRIER
CUT LINE
FOLD WEATHER RESISTANT
BARRIER INTO ROUGH OPENING
FOLD WEATHER
RESISTANT BARRIER
TO INTERIOR. TRIM OFF
EXCESS. STAPLE ENDS
TO FRAMING. PLACE
STAPLES EVERY
12" TO 16".
VIEWED FROM INTERIOR
FIGURE 1
FIGURE 3
SEE
DETAIL
9"
9"
45°
FIGURE 2
FIGURE 4