Specifications

PS2000 Installation Instructions
For more information contact Hubbell Wiring Device Kellems
Toll free (800) 288-6000 or www.hubbell-wiring.com
P a g e | 14
Rev. 1.0--
Rev. 4.112.12.13
2.5 Concrete pedestal installation diagrams
Isometric of Base
Figure 16
Front of the concrete base
and PEP Station
8”
8”
1
1
1’
Exterior of Sonotube
concrete form
Square foam
insert flush with
curb line
12”x12” Square steel
tapered form
8”x8”x1/16” Steel
mounting plate with
pre-drilled holes for (2)
rigid conduit and (4) J-
Bolts
12”x12” Square steel
tapered form
Exterior of Sonotube
Concrete form and
square foam insert
(4) ½”x 6” J-Bolts, leave
1 ¼” max. above steel
plate
(1) 1 ¼” Conduit and (1)
¾” conduit, leave 1”
max. above steel plate
1 ¼” Conduit for 208-
240V dedicated circuits,
leave 1” max. above
steel plate
(4) ½”x 6” J-Bolts, leave 1 ¼”
max. above steel plate
12”x 12”x 29” Reinforced
black concrete base on
16” Dia. x 42” deep footing
8”x 8”x 1/16” Steel
mounting plate with
pre-drilled holes for (2)
rigid conduit and (4) J-
Bolts
¾” Conduit for low-
voltage Ethernet wire,
leave 1” max. above
steel plate
Top View
Figure 16
Section 1-1
Figure 17
1’
1’- 4 1/8”
Front
Rear
Front face of
curb
Saw cut line
Isometric of Base
Figure 18