2.4 Concrete pedestal installation process and checklist
The following set of instructions outlines the process for casting the concrete pedestal and installing the associated
components. Some installations may deviate from this process due to site restraints and local codes. Any significant
deviation from this process must be reported and approved by PEP Stations, LLC. This section does not include
instructions on wiring.
Steps:
1. Excavate approximately an 18diameter by 42” deep area for an
earth formed footing and Sonotube concrete form.
2. Position the 9”x54” prefabricated circular reinforcing cage within
the excavated area
3. Run the 1 ¼” and ¾” conduits through the reinforcing cage, see
Figure 10.
4. Mix the first batch of concrete (3,000 psi or greater, no pigment
necessary) and pour the earth formed footing from 42” below
grade to 10below grade, 32total. The top of the earth formed
footing should be 10” below finished grade.
Important: Do not allow the concrete footing to cure
before pouring the concrete base in steps 8 through 11.
5. Position the 38” Sonotube concrete form in the excavated area.
The top of the Sonotube should be 28” above the surface that the
user will stand on when operating the PEP Station. The bottom of
the square insert should be approximately 1” below grade and
bottom of the tube approximately 10 below finished grade. See
Figures 19 and 20 for details.
6. Backfill around the Sonotube form. Plumb and level the form.
7. Extend 1 ¼” conduit and ¾” conduit up through the center of the tube.
Important: The 1 ¼” conduit should be centrally located in the Sonotube. The ¾”
conduit should be installed 2 ½(center-to-center) to the RIGHT of the 1 ¼”conduit
when looking at the base from the parking spots.
Figure 3
Figure 4
Figure 9
Figure 10
Figure 11