Specifications
NanoLumens Flexible Display Setup and Operation Manual
18 DMAN-0001 REV B
1. Carefully lay the display face-down, flat, on the provided cover and debris-free
surface.
WARNING! VERY IMPORTANT!
Clear the foam, floor or table work surface
of any debris.
It is very important that the display face
does not get scratched.
2. Using the recommended tools, remove any installed mounting hardware.
3. Add the eye bolts with appropriate hardware to the hanging bar in the position
shown.
Figure 8. Install the Eye Bolts on the Hanging Bar in the Centermost Positions for Rolling Cart
Figure 9. Close-up of Eye Bolt Assembly
4. Extend the integral handle bars out on each side of the hanging bar.
Two people are required for steps 5 and 6.
Eye Bolt
3/8-16 Flat Washer
Hanging Bar (open
end down, in between
flat washers)
1/4-20 Flat Washer #1
Standard Rubber
Grommet
1/4-20 Flat Washer #2
Nylon Locking Nut










