Assembly Instruction

WIEDEN MEDIA GAMING TOWER
Made in China - r08 Page 3 of 5
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
shelf
pin
6 With the assistance of another adult, fit dowels
of bottom panel into corresponding holes of left
and right side panels as shown. Secure all cams.
top panel
7 A) Fit dowels of top panel into corresponding holes of
left and right side panel as shown. Secure all cams.
B) Insert 12 shelf pins at desired shelf heights. Press pins
firmly to secure.
C) Attach magnet to right side panel with 2 magnet
screws, using a screwdriver as shown.
8 With the assistance of another adult, position unit
upright as shown. Place 3 adjustable shelves onto
shelf pins. Make sure shelves are securely supported by
each shelf pin.
adjustable
shelf
bottom
panel
magnet
back panel
left side
panel
right side
panel
NOTE: Make sure arrows
on each cam points toward
nearest edge with holes
fixed
shelf
A
B
5 A) Make sure arrows on each cam points toward
nearest edge with holes. Fit dowels of left side panel
into corresponding holes of back panel and fixed shelf.
B) Fit dowels of right side panel into corresponding
holes of back panel and fixed shelf. Secure all cams.
B
A
C