Assembly Instruction
Made in Vietnam - r03 Page 2 of 2
WELLS BED
Customer Service 800.967.6696 |  Latest instructions available at www.crateandbarrel.com
A
1  A)  Insert 4 wood dowels into headboard and 
footboard as shown. 
B) With assistance of another adult, fit dowels of 
headboard into corresponding holes of left and right side 
rails as shown.  Attach each side rail to headboard with 2 
bolts, 2 spring washers and 2 flat washers as shown.  
Secure, but do not over tighten, bolts with an allen 
wrench. 
Repeat steps for footboard.
2  A)  Insert 2 support legs into center support rail. as 
shown. Turn each  leg counter-clockwise to secure.
B) Fit center support rail into brackets of headboard and 
footboard as shown. Push down firmly until rail securely 
engages each bracket.
left side
rail
NOTE: Do not over
tighten the bolts
right side
rail
B
headboard
footboard
A
B
B
3   With assistance of another adult, carefully align slat 
assembly with pre-installed blocks on each side rail.  Attach 
slat assembly to each side rail with 2 screws. Secure, but do 
not over tighten, screws with a phillips head screwdriver.  
Assembly is now complete.
NOTE: Do not over
tighten the screws
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not use 
abrasive cleaners. Do not use furniture wax or polish as the 
wood is finished with a protective clear lacquer. 
NOTE: Make sure straps of 
slat assembly are facing up
 as shown 


