Assembly Instruction

Customer Service 800-967-6696 | http://www.crateandbarrel.com
5 Turn case assembly upright . Insert 8 shelf pins
at desired shelf heights and place 2 adjustable
shelves into position. Make sure shelves are securely
supported by the shelf pins.
VENETIAN BATH TOP CABINET
Page 2 of 3
Made in China - r04
A
B
2 Insert 2 cam screws into remaining side panel. Fit onto
base panel and secure cams.
3 Slide the back panel into the slot at rear of side and
base panels.
4 A. Fasten 4 cam screws to inner holes of top panel.
B. Insert 4 cams into holes at top of case assembly.
C. Fit top panel onto case assembly and secure 4 cams
with the screwdriver.
C