Assembly Instruction
SUMMIT HUTCH
Made in China - r04 Page 3 of 5
5 A) Insert 8 shelf pins at desired shelf heights as
shown.
B) Place adjustable shelves into assembled unit as
shown. Make sure each shelf is securely supported by
shelf pins.
adjustable
shelves
A
B
6 Fit the bottom rollers of the right door into
back groove. Depress levers located at the
top of the door, tilt the door into the groove in
the top panel. Release the levers to secure
door. Repeat steps for left door, fitting it into
the front groove.
A
right door
left door
grooves on
bottom panel
grooves on
top panel
LEVERS LOCATED
BEHIND DOOR
FRAMES
Customer Service 800.967.6696 | www.crateandbarrel.com









