Assembly Instruction
Customer Service 800-967-6696 | http://www.crateandbarrel.com
HARDWARE
3 Determine if you want to use standard or legal size
hanging files. Fit metal rail through the front hole for
standard hanging files or the rear hole for legal size and push
down into slot to secure in place.
Assembly is now complete.
Thank you for
purchasing the Parallel
Rolling File. This page
lists all the contents
included in the box.
Please take time to
identify the hardware as
well as the individual
components of this
product. As you unpack
and prepare for
assembly, place the
contents on a carpeted
or padded area to
protect them from
damage.
Note: 2 people are
required to safely
assemble this product.
COMPONENTS
1 - drawer
case
3 - casters
2 - locking
casters
TOOLS REQUIRED
Phillips head screwdriver
x 5
C
PARALLEL ROLLING FILE
Page 1 of 1
Made in China - r05
2 A. With the assistance of another adult, place drawer
case upside down on a padded surface.
B. Position casters as shown, with the 2 locking casters on
the front side.
C. Attach each caster with 4 screws. Fully tighten each
screw with a phillips head screwdriver.
Missing hardware? Please call 800.606.6387 for
replacements.
20 - wood screws
A
B
Locking
Caster
Locking
Caster
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not use
abrasive cleaners. Do not use furniture wax or polish as the
wood is finished with a protective clear lacquer.
1 Open both drawers and remove knobs (attached to the
inside of the drawers for shipping) by loosening each screw
with a phillips head screwdriver. Reattach the knobs to the
outside of the drawer fronts.
Hole for
legal size
Hole for
standard size

