Assembly Instruction
COMPONENTS
Made in Malaysia - r09 Page 1 of 5
Thank you for purchasing the Ledge 4 Drawer Chest.
This page lists all the contents included in the box.
Please take time to identify the hardware as well as the
individual components of this product. As you unpack
and prepare for assembly, place the contents on a
carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
LEDGE 4 DRAWER CHEST
1 - top
drawer back
1 - top panel 1 - base
3 - bottom
drawer fronts
2 - side panels
(1 left, 1 right)
1 - back panel
1 - top
drawer front
ASSEMBLY HARDWARE
TOOLS REQUIRED
Missing hardware? Please call
800.606.6387 for replacements.
14 - wood
dowels
6 - small
bolts
6 - large
bolts
phillips head screwdriver
1 - bottom
panel
16 - small
screws
(We recommend the use of hand tools instead power tools)
allen wrench (included)
3 - bottom
drawer backs
32 - drawer
screws
10 - large
screws
4 - adhesive
feet
2 - top drawer
side panels
(1 left, 1 right)
6 - bottom drawer
side panels
(3 left, 3 right)
4 - drawer bottoms
1 - crossbar
2 - cam
screws
2 - cams
2 - large
screws
2 - wall
straps
4 - wall
brackets
2 - plastic
anchors
WALL MOUNTING HARDWARE
2 - small
screws
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com