Assembly Instruction

COMPONENTS
Made in Vietnam - r03 Page 1 of 4
Thank you for purchasing the Farrow Entryway Cabinet.
This page lists all the contents included in the box.
Please take time to identify the hardware as well as the
individual components of this product. As you unpack
and prepare for assembly, place the contents on a
carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
FARROW ENTRYWAY CABINET
1 - partition
1 - top panel 1 - front frame
4 - adjustable
shelves
1 - back panel
2 - side panels
(1 left, 1 right)
ASSEMBLY HARDWARE
TOOLS REQUIRED
Missing hardware? Please call
800.606.6387 for replacements.
22 - spring
washers
14 - small
flat washers
16 - shelf
pins
phillips head screwdriver
1 - bottom
panel
4 - small
screws
4 - large
screws
2 - wall
straps
4 - wall
brackets
4 - plastic
anchors
(We recommened the use of hand tools instead power tools)
allen wrench (included)
WALL MOUNTING HARDWARE
4 - legs
8 - large
flat washers
16 - small
screws
14 - small
bolts
6 - large
screws
8 - large
bolts
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com

Summary of content (4 pages)