Assembly Instruction
ASSEMBLY HARDWARE
TOOLS REQUIRED
COMPONENTS
Page 1 of 4
Thank you for purchasing the Delavan Two Door
Cabinet. This page lists all the contents included in
the box. Please take time to identify the hardware as
well as the individual components of this product. As
you unpack and prepare for assembly, place the
contents on a carpeted or padded area to protect
them from damage.
Note: 2 people are required to safely assemble this product.
DELAVAN TWO DOOR CABINET
Missing hardware? Please call
800.606.6387 for replacements.
2 - large
screws
1 Fit pre-assembled dowels of partition into correspond-
ing holes of base assembly and secure with 2 large
screws as shown. Secure, but do not over tighten, screws
with a phillips head screwdriver.
WALL MOUNTING HARDWARE
4 - medium
screws
4 - large
screws
2 - wall
straps
4 - wall
brackets
4 - plastic
anchors
18 - small
bolts
8 - large
bolts
23 - small
screws
26 - spring
washers
26 - flat
washers
4 - pull
bolts
16 - shelf
pins
1 - front frame
phillips head screwdriver
(We recommened the use of hand tools instead power tools)
1 - top
panel
1 - base
assembly
2 - side panels
(1 - left, 1- right)
1 - back panel
4 - adjustable
shelves
1 - partition
2 - pulls
NOTE: Do not over tighten
the screws
Made in Vietnam - r03 Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com