Assembly Instruction

HARDWARE
TOOLS REQUIRED
COMPONENTS
1 A) Insert 4 wood dowels into bottom panel as shown.
B) Insert 6 wood dowels into top panel as shown.
A
B
Made in China - r07 Page 1 of 3
Thank you for purchasing the Delano Sideboard. This
page lists all the contents included in the box. Please
take time to identify the hardware as well as the
individual components of this product. As you unpack
and prepare for assembly, place the contents on a
carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
DELANO SIDEBOARD
Missing hardware? Please call 800.606.6387 for replacements.
18 - wood
dowels
10 - medium
bolts
2 - small
bolts
4 - large
bolts
2 - bolt
caps
16 - flat
washers
16 - spring
washers
8 - shelf
pins
2 - pull
screws
21 - screws
1 - partition 2 - back panels
(1 left, 1 right)
2 - side panels
(1 left, 1 right)
2 - left and
right doors
(pull pre-attached
to right door)
2 - adjustable
shelves
(1 left, 1 right)
4 - legs 1 - pull
1 - bottom
panel
1 - top
panel
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
(We recommend the use of hand tools instead of power tools)
allen wrench (included)
phillips head screwdriver