Assembly Instruction

Made in Vietnam - r04 Page 3 of 3
1 A) With the assistance of another adult, insert the
notched metal plate of the side rails into the bottom
slots of the headboard. Push down firmly on each
side rail to secure
B) Attach the footboard using the same method.
BRIGHTON FULL, QUEEN AND KING BED
2 Place the slat assembly onto assembled unit and attach
with 8 screws as shown. Secure screws with phillips head
screwdriver.
3 A) Attach 3 short support legs onto center
rail as shown. Turn each leg clockwise to secure.
B) Attach center rail onto slat assembly from
below as shown. Attach with 4 bolts and secure
with a screwdriver.
Assembly is now complete.
before
insertion
after
insertion
center rail
leg
ASSEMBLY OPTION 2:
FOR MATTRESS WITH
BOX SPRING
CLEANING & CARE
Clean surfaces with a dry or damp soft cloth. Do not use
abrasive cleaners. Do not use furniture wax or polish as the
unit is finished with a protective clear lacquer.
center rail
Customer Service 800.967.6696 | Latest instructions available at www.crateandbarrel.com
A
B
A
A
B
B