Manual

General Information
Safety Information
WHEN CUTTING OR DRILLING, ALWAYS WEAR PROTECTIVE GLASSES OR GOGGLES AND A FACE MASK WHICH COVERS
THE FACE AND MOUTH. Itching due to glass bers may be avoided by the use of barrier creams on exposed skin areas. Hearing
protection is also recommended.
Supplies and Equipment
Supplies will vary depending on wall substrate, adhesive choice and seam treatment selection.
STANDARD FRP TOOLS NEEDED
Crane Composites Laminate Roller (Part # R50ROLLER)
Crane Composites V-notched Trowel 3/16′′ x 1/4′′ x 5/16′′ (Part # R50TROWEL)
Circular saw with ne tooth carbide tipped saw blade
Swivel-head 18 gauge shears
• Drywall Roto-Zip®
• Jig-Saw
• Flat edge nishing tool (putty knife or equivalent)
MATERIALS NEEDED
Crane Composites Standard FRP or Innovative Finishes Panels
• Adhesive - Crane Advanced Polymer Adhesive (R53829) or Crane Fast Grab Adhesive (R53828)
Refer to page 5 for assistance in selecting the appropriate adhesive
Soap and water for clean-up (Latex or Polymer adhesives)
• Saw horses
Plywood larger than panels
Dry, lint free rags
Sandpaper or Paper Tiger® Wallpaper Removal Tool for roughing up wall
• Tape measure
• Utility knife
• Six-penny nishing nails
Carbide tipped laminate cutter
• IMPORTANT NOTE: If installation room has high humidity (65% or higher) then a portable low-cost dehumidi er unit is suggested.
SEAM TREATMENT
• Moldings
Color Coordinating Caulk
Seam Sealant (cleanroom only)
Cleanroom Wall System Seam Sealant - 7555 Urethane Sealant (R53827)
• Applicator - Pneumatic Dual Chamber Applicator Gun (R50CAULKGUN)
400ml Static Mixing Tips - 3/8′′ x 11′′ x 24 EL
• Finishing Kit - Inline Seam and Radial Seam Finishers for seam smoothing (R50SEAM-KIT)
Panel Tape - 1′′ by 144 yds (R53522)
Solvent for clean-up (IPA, acetone)
Protective gloves needed when using seam sealant
Storage
Panels should be stored indoors on a solid, at, dry surface other than the oor. Do not stack on concrete oor or any other surface that
emits moisture. Lay panels at with proper support on the ends of panels. Do not stand panels on edge. All FRP panels must be stored
inside. Optimum storage conditions are 60° to 75° (16°C to 24°C) and 35% to 55% relative humidity
(Figure 1)
.
Figure 1
3