Owner's Manual
INSTALLATION STEP 2
Install the Header Bracket
You can attach the headerbracket either to the wall abovethe
garagedoor, or to the ceiling. Follow the instructions which will
work bestfor your particular requirements. Do not install the
header bracketover drywall. If installinginto masonry,use
concreteanchors(not provided).
WALLHEADERBRACKETINSTALLATION
• Centerthe bracket on the vertical centerline with the bottom
edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling).
• Mark thevertical set of bracket holes. Drill 3/16" pilot holes and
fasten the bracket securely to a structural support with the
hardware provided.
HARDWARESHOWN ACTUALSIZE
Lag Screw
5/16"-9xl -5/8"
- Header Wall
2x4
Structural
Suppo_
J
I
Horizontal
Line
i
Highest Point of
GarageDoorTravel
Wall Mount
Optional
Mounting Holes
Vertical
Centerline
of Garage Door
_ Lag Screws
5/16"-9xl-5/8"
Door Spring
Vertical
Centerline
of Garage Door
CEILINGHEADERBRACKETINSTALLATION
• Extendthe vertical centerline onto the ceiling as shown.
• Centerthe bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the
ceiling when clearanceis minimal.
• Mark the side holes. Drill 3/16" pilot holes and fasten bracket
securely to a structural support with the hardware provided.
Ceiling Mounting Holes
i
I
Bracket
6" (15 cm) M
- Finished Ceiling -
Vertical Centerline
of Garage Door
Door
Spring
HeaderWall -
Centerline
of GarageDoor
13










