Installation Instructions

6
Square unit
Items Needed:
Leveling Foot (Qty: 4)
Process:
• Install (4) leveling feet. Some adjustments may be
necessary after cabinet is in desired location.
• Place the cabinet in its upright position.
• Square the cabinet and wrench tighten all bolts from steps
1-5.
Items Needed:
#8 - 32 x 3/8" Pan Head Screw (Qty: 12)
Single Bitted Lock (Qty: 1)
Magnet (Qty: 2)
NOTE: Lock on the 48-inch wide oor cabinet is not
installed. Install before attaching door.
Process:
• Ensure lock on right side door is in the unlock position.
• Attach right side door as shown, using (6) screws.
• Adjust door for optimum performance before tightening
screws. Care should be taken so as not to over tighten.
• Attach left side door in the same manner.
• Attach magnets to shelves to hold right door closed.
Note: Magnets should be positioned to only engage the right
door. Right door will keep left door closed.
#8 - 32 x 3/8"
Pan Head
Screw
Right
Door
Magnet