Operator`s manual
of identical parts. These will be put together
into left and right foot assemblies which are
mirror images of each other. (Figure 22)
6. Put a groovedpin through the hole in the
rod.
7. Put a washer and spring in place on the bot-
tom of the rod, and then slide the rod all the
way down. (Figure 24)
Fig. 22 - Left and Right Foot Assemblies
4. Place an actuator box in front of you with
the C-shaped slot facing you and the closed
surface of the box to the left. This will be-
come the left foot assembly. (Figure 23)
Rod
Actuator Box
Fig. 24 - Building Left Foot Assembly
Square
Opening
Grooved Pin
"Washer And
Spring
C-Shaped
Slot
Actuator Box
8. Slide a lever through the C-shaped slot in
the actuator box, through the square hole in
the rod, and through the square opening in
the back of the actuator box. Make sure that
the lever bends toward the left. (Figure 25)
Lever - Bends
Toward Left
Fig. 23
5. Slide a rod halfway down into the actuator
box. Make sure that the threaded end of the
rod is down, and that the smaller square open-
ing in the rod is facing you.
C-Shale
Smooth Pin
_'_ Actuator Box
Fig. 25 - Building Left Foot Assembly
13