Specifications
HAVE A QUESTION? CALL HART CLIENT CARE at 800-252-2818, or EMAIL US AT help@hartsystems.com
RECEIVE COMPONENTS/SUPPLIESRECEIVE COMPONENTS/SUPPLIES
Page 1
You will receive one equipment box containing all of the necessary components for
Inventory.
The box will be sealed with tape. Cut the tape with a knife, do not rip tape off.
When opening the box, be careful. Try not to rip or damage the box. You will use the
same box to return the components to Hart Systems.
Inside one equipment box, you will find:
○ (5) Scanners
○ (1) Access Point labeled “PRIMARY”
○ (1) Access Point labeled “SECONDARY”
○ (2) Additional Batteries.
○ (3) Scanner chargers - Hart strongly recommends charging all of the scanners
before inventory
NOTE: The scanners will have 15+ hours of battery life. However, if you need to change
a battery during Inventory, place the discharged battery in the plastic bag
provided and return to Hart along with the equipment.
DO NOT THROW THE BATTERIES OUT.
Remove the Scanners from the foam insert, then remove the foam insert itself and
continue with the following “layers”.
You will also receive:
A Customer Service Survey. Please complete the survey at the end of Inventory, and
include it in the equipment boxes returned to Hart Systems.
A Shipping Instructions envelope, containing labels and documents used to ship the
box back to Hart Systems when the inventory is complete.
The Shipping Envelope is located in the clear, plastic pouch affixed to the inside
“lid” of the equipment box.
To ensure the return paperwork is not misplaced, leave the envelope in the
pouch until you are ready to ship back your equipment.