Specifications

HAVE A QUESTION? CALL HART CLIENT CARE at 800-252-2818, or EMAIL US AT help@hartsystems.com
RECEIVE COMPONENTS/SUPPLIESRECEIVE COMPONENTS/SUPPLIES
Page 1
You will receive one equipment box containing all of the necessary components for
Inventory.
 The box will be sealed with tape. Cut the tape with a knife, do not rip tape off.
 When opening the box, be careful. Try not to rip or damage the box. You will use the
same box to return the components to Hart Systems.
 Inside one equipment box, you will find:
(5) Scanners
(1) Access Point labeled “PRIMARY”
(1) Access Point labeled “SECONDARY”
(2) Additional Batteries.
(3) Scanner chargers - Hart strongly recommends charging all of the scanners
before inventory
NOTE: The scanners will have 15+ hours of battery life. However, if you need to change
a battery during Inventory, place the discharged battery in the plastic bag
provided and return to Hart along with the equipment.
DO NOT THROW THE BATTERIES OUT.
 Remove the Scanners from the foam insert, then remove the foam insert itself and
continue with the following “layers”.
You will also receive:
 A Customer Service Survey. Please complete the survey at the end of Inventory, and
include it in the equipment boxes returned to Hart Systems.
 A Shipping Instructions envelope, containing labels and documents used to ship the
box back to Hart Systems when the inventory is complete.
 The Shipping Envelope is located in the clear, plastic pouch affixed to the inside
“lid” of the equipment box.
 To ensure the return paperwork is not misplaced, leave the envelope in the
pouch until you are ready to ship back your equipment.