Technical data
32
HB EML3020 A-(en)LevelWave LR01
Bypass chambers
Installation next to tanks containing one liquid and foam
• The top process connection of the bypass chamber must be above the maximum level of
liquid.
• The bottom process connection of the bypass chamber must be below the lowest measured
level of liquid.
Installation next to tanks containing more than one liquid
• The top process connection of the bypass chamber must be above the maximum level of
liquid.
• The bottom process connection of the bypass chamber must be below the lowest measured
level of liquid.
• Additional process connections are necessary for the liquids to circulate freely along the
length of the bypass chamber.
3.5.5 Wall support for the remote version
1 Use marks on the wall to help you put the wall support in the correct position. For more data,
refer to Dimensions and weights on page 108.
2 Use equipement and tools that agree with health and safety regulations and good engineering
practice.
3 Make sure the wall support is correctly attached to the wall.
Figure 3-19: Wall support for the remote version (attached to the remote converter)










