Instruction manual
11
template to facilitate proper
installation alignments (See figure
5 below).
Clearances for
installation
The figures 5A and 5B show the
proper distances to keep from any
obstacle pertaining to the support
bracket (2) or to the wall.
The procedure for installing the
BMS is as follow:
1) - Take the support bracket (2)
and choose a position with proper
clearances, as per Figures 5A &
5B. A minimum clearance of 40
(100mm) is required from the front
of the heater.
WARNING: Please take caution
when choosing a mounting
surface for the heater. The weight
of the heater with water is
approximately 165 lbs. Make
certain that the wall can support
such weight.
2) Screw the bracket to the wall.
The screws MUST screwed in
correspondence of the 16" vertical
studs.
3) Place the template onto the
support bracket and make all
rough-in holes for the piping to the
heater. The hole for the coaxial
flue vent kit discharge may also
be cut at this time.
4) Install the heater on the support
bracket and secure all of the
connections.
Figure 5A - Clearances for model BMS
Figure 5B - Clearances for model BTS
A INSTALLATION INSTRUCTIONS