Installation Guide
- Please make sure that the arrow is positioned on the same side as
the appliance controls. Make 4, Ø8 holes in the ceiling and drive in 3
screws without completely tightening them(Fig2). Pay attention not to
insert the screw into the hole marked with an X on the hole template (the
screws and expansion plugs must be suitable for the type of wall).
- Take the upper part of the structure B and insert the 3 slots onto the 3
screws that are not completely tightened. (Fig3)
Rotate slightly to fit.
Drive in the fourth screw X and tighten the remaining 3 to allow definitive
blocking of the upper part of structure B.
- Take the lower part of the telescopic structure C and insert it into
the upper structure B.
- Adjust the height (Fig.5) by referring to the amounts calculated in
the mathematical formula and fix the position using the 8 unit screws G
that are supplied (Fig.4)
- Ducted option: fix the flexible duct to the air evacuation hole that you
have prepared. (Fig.6).
- Take the upper chimney piece and fix it with 4 unit screws G. (Fig.7)
- Take the lower chimney and fix it with 2 unit screws G to hold its
position.(Fig.8)
- Insert the suction unit inside the structure and set in 4 mounting
holes, drive in 4 unit screws N. (Fig.9).
- Fix the air evacuation pipe H (not supplied) onto the connection
flange (Fig.10)
- Unscrew the 2 screws G and rest the lower chimney piece above
the cooker hood (Fig.11).










