Installation Guide

19
GAS SUPPLY REQUIREMENTS
IMPORTANT:
Observe all governing codes and ordinances.
This installation must conform with all local codes and ordinances. In the
absence of local codes, installation must conform with American National
Standard, National Fuel Gas Code ANSI Z223.1/NFPA 54 - latest edition,
or in Canada, the Natural Gas and Propane Installation Code, CAN 1-1.1-
M81 - latest edition.
Leak testing of the range must be conducted according to the
manufacturer's instructions. Do not use a flame to check for leaks.
WARNING
FIRE AND EXPLOSION HAZARD
Use a new CSA International approved gas supply line.
Install a shut-off valve.
Securely tighten all gas connections.
If connected to LP, have a qualified person make sure gas pressure does
not exceed the maximum pressure listed in this section.
Examples of a qualified person include:
- licensed heating personnel
- authorized gas company personnel
- authorized service personnel
Failure to do so can result in death, explosion or fire.