User's Manual
Voasis™ Access Pod (VAP) Installation and Monitoring
Voasis™ UMTS/DCS/PCS Installation and Configuration Manual 31
5.6 Verifying Complete Coverage
Using appropriate test equipment, walk around the facility and verify coverage at all points.
If coverage gaps are indicated, move the units around or add units to achieve maximal
coverage.