User's Manual
Table Of Contents
- Preface Material
- Policy for Warrantee and Repair
- General Warranty
- Specific Product Warranty Instructions
- Returns
- Limitations of Liabilities
- Reporting Defects
- Safety Warnings
- Compliance with RF Safety Requirements
- Certification and Compliance to Standards
- About This Guide
- List of Acronyms
- Table of Contents
- 1 Overview
- 2 Installation Workflow
- 3 Infrastructure Requirements and Layout Planning
- 4 VCU Unit Installation and Provisioning
- 5 VAP Installation and Provisioning
- 6 Navigating the Web Access Application
- 7 VCU Monitoring and Configuration
- 8 VAP Monitoring and Configuration
- 9 Administrative Operations
- 10 Troubleshooting
- Appendix A - Traps
- Appendix B – MobileAccess VE MIB Tree Structure (Version 1.8)
VAP Installation and Provisioning
Mixed Band LTE 700 MHz MobileAccessVE Instant Coverage Solution User Manual 38
5.2 Desk and Wall Mount VAP Installations
5.2.1 VAP Kit Contents
The LTE 700 MHz VE Access Pod (VAP) Kit includes:
Kit Items UNIT
VE Access Pod (VAP)
Mounting Bracket
Note: Mounting Bracket can be
used for installing on wall or on
ceiling.
Assortment of optional screws for
mounting bracket on surface
RJ-45 Communication Cable
Table 5-1: Desk and Wall Mount VAP Kit
5.2.2 VAP Installation Procedure
1. Mark and drill holes on the flat surface (i.e. wall or ceiling) according to the installation holes
located in the center of the bracket.
2. Using the appropriate screws (depends on surface type) secure the bracket to the wall or
ceiling.
Note 1: The bracket is mounted in the direction shown in Figure
5-1.
Note 2: An assortment of screws are supplied, however they are optional.
Rear View
Front View