User's Manual
Table Of Contents
- Preface Material
- Policy for Warrantee and Repair
- General Warranty
- Specific Product Warranty Instructions
- Returns
- Limitations of Liabilities
- Reporting Defects
- Safety Warnings
- Compliance with RF Safety Requirements
- Certification and Compliance to Standards
- About This Guide
- List of Acronyms
- Table of Contents
- 1 Overview
- 2 Installation Workflow
- 3 Infrastructure Requirements and Layout Planning
- 4 VCU Unit Installation and Provisioning
- 5 VAP Installation and Provisioning
- 6 Navigating the Web Access Application
- 7 VCU Monitoring and Configuration
- 8 VAP Monitoring and Configuration
- 9 Administrative Operations
- 10 Troubleshooting
- Appendix A - Traps
- Appendix B – MobileAccess VE MIB Tree Structure (Version 1.8)
VCU Unit Installation and Provisioning
Mixed Band LTE 700 MHz MobileAccessVE Instant Coverage Solution User Manual 23
4.3.1 Shifting Relevant Ethernet LAN Connections
For VAPs installed on currently ACTIVE Ethernet ports, shift the relevant Ethernet LAN
connections to the Ethernet ports on the Master or Slave VCU.
For VAPs installed on currently INACTIVE Ethernet ports, connect as follows.
Note: After the Slave VCUs are installed and connected to the correct ports in the patch panels,
please proceed with the VAP installation as described in chapter
5 . However, it is recommended
to complete the VCU provisioning first (See section
4.4) because when installing the VAPs they
will instantly provide the wireless service (and the installer will be able to check the coverage).