User's Manual

VCU Unit Installation and Provisioning
Dual-Band MobileAccessVE Instant Coverage Solution User Manual 21
4.3 Installation of Slave VCU
1. Install the Slave VE Control Unit (VCU) in the Telco closet corresponding to the floor being
covered. The Slave VCU can be installed in the rack using the supplied bracket in the IDF
closet. Apply power to the Slave VCUs and note that the VCU PWR LED is lit. Note that the
unit ACT LED completes initialization (solid light) and shows a blinking green light. See
Figure 4-1.
Figure 4-1. VCU PWR, RF and VCU/VCH LEDs
2. Connect the Slave VCU front panel VCU/VCH port to the Master VCU VAP port via the
patch panel using dedicated CAT6 cables. Verify that the VCU/VCH LED completes
initialization (blinking light) and shows a solid green light. The RF LEDs (of both services)
should turn OFF.
Figure 4-2. Master and Slave VCU Connections
PWR LED
VCU/VCH LED
RF Source LEDs
(one per service)