User's Manual
System Installation I P/N: 709C0011101I Page 12
3 System Installation
The following sections provide an overview of the installation procedure for the QX and an
SCU-F unit.
Note: The QX must be installed with the SCU (in rack installations - preferably below the SCU).
The QX can be mounted using one of the following options:
• 19-in Rack – pre-assembled rack ears
• Wall mount (interfaces facing front like in a rack installation) – supplied bracket
• Vertical wall mount –interfaces facing down - ordered separately (P/N AK-QX-ENC-WMT-V)
NOTE: Be sure to read the Installation Requirements (see section 2.2) and Power Consumption related
instructions (see 2.3.3section 2.5) before proceeding with the actual connections.
3.1 Overview of Physical Installation
Physical installation procedure steps
1. Unpacking and inspecting supplied items for QX and SCU-F units – see section 3.2.
2. Mounting SCU-F unit (not included – ordered separately)
3. Mounting QX unit
3.2 Unpacking and Inspection
This section provides instructions for opening the shipping box, verifying that all supplied items
have been received, and verifying that no shipping damage has occurred.
Unpack and inspect the cartons according to the following procedure
1. Open the shipping carton and carefully unpack each unit from the protective packing
material.
2. Check for signs of external damage. If there is any damage, call your CMA service
representative.