User's Manual
ModuLite Installation Guide FINAL TEST
Foxcom Wireless Confidential and Proprietary Information
Document No. 43-93-005-05 y 60
9. Final Test
The following checklist should be consulted when reviewing the system’s setup:
• Check power supplies.
• Check that all LED’s are lit.
• Carry out Walk Test, checking all antenna locations, and checking the RSSI power levels at
those locations.
9.1. Modular Base Unit and Modular Remote Cabinet Connections
When the ModuLite
TM
is being installed the LED’s on the units can verify that the optical fibers
are performing correctly, and that proper connections have been made. Foxcom Wireless
recommends checking the status of all connections in the ModuLite
TM
system in order to make
sure that the installation was carried out correctly. Verification is done by checking the LED’s on
the Modular Base Unit and Modular Remote Cabinets. See Table 10 for an explanation of the
possible optical LED performance status and how to deal with problems.
Note
When the MRC not receiving light signal from Modular Base Unit, power to laser is
disconnected.