4.8.2. ModuLite™ Installation Parts List
The following parts are needed for setting up the ModuLite
TM
Base and Modular Remote
Cabinets. A fiber contractor handles cable splicing in order to connect the units. The fiber
contractor needs to use the parts list from Table 5 to arrange all equipment necessary for setting up
and installing the ModuLite
TM
.
Table 5: ModuLite
TM
Installation Parts List
The following tables refer to a full configuration 32 floor building:
Equipment Description Quantity Comment
Coax cable (per 1m) according to
the technology (7-8dB loss for
100m in 1000MHz)
Connect MRC to
antenna.
As needed
Antenna As planned
Optical cable (8*9) 72 fibers
singlemode fiber
Optic cable for short
distance & protected
environments (tight
buffer type).
Total=500m
Patch panel 72 cabinet with
SC/APC adaptors.
Connect jumpers to base
and pigtails to splice tray.
2
Splice box Connects optic cable
from Cabinet and pigtails
to MRC.
11 1 per 3
floors
Splice tray Tray-1*50 connects cable
optic and pigtails near
Modular Base Unit.
4 In some
cases in
patch panel
9/125/3000 3m optical jumpers
with SC/APC connector
(simplex).
Connect patch panel to
MBU.
256
9/125/900 5m Pigtail with
SC/APC connectors (B)
Connect patch panel and
splice tray.
344
9/125/3000 15m Pigtail with
SC/APC connectors (R)
Connect patch panel and
splice tray.
168
Electricity cables (per 1m) Delivers power to units. According
to length.
Electricity ducts (per 1m) Ducts for moving cables
though building.
According
to length.
If needed
Coax connectors n-type Cable connectors As needed